Main Page: Difference between revisions

From ossos
Jump to navigationJump to search
No edit summary
Line 6: Line 6:




== Data Releases ==
= Data Releases =


=== Collaboration Data Releases ===
== Collaboration Data Releases ==


The Teams will receive the object list for each semester's discoveries as a summary table of
The Teams will receive the object list for each semester's discoveries as a summary table of
Line 24: Line 24:
* '''[[2013AE data release]]''' (access restricted to collaboration only)
* '''[[2013AE data release]]''' (access restricted to collaboration only)


=== Public data releases ===
== Public data releases ==


We aim to submit all observations of a given semester to the MPC 6 months after
We aim to submit all observations of a given semester to the MPC 6 months after
Line 36: Line 36:
e.g. on August 1, 2014, the 2013A CFHT imaging become public to the world.
e.g. on August 1, 2014, the 2013A CFHT imaging become public to the world.


== Collaboration Teams ==
= Collaboration Teams =
The principle contact for each team member should be their topic team's leader.
The principle contact for each team member should be their topic team's leader.


Line 55: Line 55:
; [[Thermal Modeling]]: Thermal evolution of objects.  Leader: A. Guilbert
; [[Thermal Modeling]]: Thermal evolution of objects.  Leader: A. Guilbert


=== [[Joining OSSOS|How to join OSSOS]] ===
== [[Joining OSSOS|How to join OSSOS]] ==


=== [[Publications and Proposals]] ===
== [[Publications and Proposals]] ==


* [https://www.dropbox.com/sh/wahdpnc9nq8gcls/g0IKwbrCt9?lst Survey and Team logos] for use in presentations etc (high-res PNGs).  
* [https://www.dropbox.com/sh/wahdpnc9nq8gcls/g0IKwbrCt9?lst Survey and Team logos] for use in presentations etc (high-res PNGs).  
* The font is (free!) Sofia Pro Light. [https://www.fontspring.com/fonts/mostardesign/sofia-pro Download it here].
* The font is (free!) Sofia Pro Light. [https://www.fontspring.com/fonts/mostardesign/sofia-pro Download it here].


== Survey ==
= Survey =


The project is surveying four fields in 2013-14, and a new set of four in 2015-16.  For great detail,
The project is surveying four fields in 2013-14, and a new set of four in 2015-16.  For great detail,
Line 68: Line 68:
[http://www.cadc.hia.nrc.gc.ca/data/pub/vospace/OSSOS/Documents/LP_Proposal.pdf Accepted Proposal] (access restricted to collaboration only).
[http://www.cadc.hia.nrc.gc.ca/data/pub/vospace/OSSOS/Documents/LP_Proposal.pdf Accepted Proposal] (access restricted to collaboration only).


=== Figures for presentations etc. ===
== Figures for presentations etc. ==


==== 2013A ====
=== 2013A ===
* [http://www.cadc.hia.nrc.gc.ca/data/pub/vospace/OSSOS/Documents/FieldLayout_13A.pdf April 2013 preliminary field layout] plot (here for reference. As in the [http://www.cadc.hia.nrc.gc.ca/data/pub/vospace/OSSOS/Documents/LP_Proposal.pdf proposal]; varied very slightly from the observed location)
* [http://www.cadc.hia.nrc.gc.ca/data/pub/vospace/OSSOS/Documents/FieldLayout_13A.pdf April 2013 preliminary field layout] plot (here for reference. As in the [http://www.cadc.hia.nrc.gc.ca/data/pub/vospace/OSSOS/Documents/LP_Proposal.pdf proposal]; varied very slightly from the observed location)
* [http://www.cadc.hia.nrc.gc.ca/data/pub/vospace/OSSOS/Documents/ObservedFields_13A.pdf April 2013 observed] plot - as the O and E fields have oppositions a month apart, the E field is shown at its 9 April moon-dark location, and the O field at its 8 May moon-dark location. The known TNOs plotted are for new moon, May 9.
* [http://www.cadc.hia.nrc.gc.ca/data/pub/vospace/OSSOS/Documents/ObservedFields_13A.pdf April 2013 observed] plot - as the O and E fields have oppositions a month apart, the E field is shown at its 9 April moon-dark location, and the O field at its 8 May moon-dark location. The known TNOs plotted are for new moon, May 9.
*[http://www.cadc.hia.nrc.gc.ca/data/pub/vospace/OSSOS/Documents/13AE_discoveries.pdf 13AE discoveries] plot - all positions for 9 April 2013
*[http://www.cadc.hia.nrc.gc.ca/data/pub/vospace/OSSOS/Documents/13AE_discoveries.pdf 13AE discoveries] plot - all positions for 9 April 2013


==== 2013B ====
=== 2013B ===
* [http://www.cadc.hia.nrc.gc.ca/data/pub/vospace/OSSOS/Documents/ObservedFields_13B.pdf October 2013 field layout] plot. The field positions and known TNO locations at October 2013 new moon (4 October).
* [http://www.cadc.hia.nrc.gc.ca/data/pub/vospace/OSSOS/Documents/ObservedFields_13B.pdf October 2013 field layout] plot. The field positions and known TNO locations at October 2013 new moon (4 October).


== Timeline ==
= Timeline =


* June 6/2012: OSSOS was number 1 ranked CFHT  Large program.  560hr awarded.
* June 6/2012: OSSOS was number 1 ranked CFHT  Large program.  560hr awarded.

Revision as of 18:07, 6 December 2013

Observations are ongoing for 13B discoveries! Check the Survey Overview for our progress in getting & processing photons.

Upcoming

  • Feb-June 2014: CFHT provides additional astrometry for 13A discoveries.
  • August 2014: All OSSOS imaging on 13A targets will have been acquired.


Data Releases

Collaboration Data Releases

The Teams will receive the object list for each semester's discoveries as a summary table of internal designations with orbital elements and uncertainties. At release, a typical object will have a semimajor axis uncertainty of 0.1-1%. Dynamical classification using the SSBN 2008 classification will be provided. Core will also provide access to the full astrometry and the imaging data for each detection.

Some topic teams will then wish to propose observations to other telescopes for next-semester studies of the sample; this will likely be the only time when the topic teams have a proposal advantage over the world. At the time of proposal, the ephemerides of most objects will be good to +/- <1 arcmin; the half-year-later CFHT recovery of all objects will have dropped these uncertainties to a few arcseconds by the time P.I.-led exploitation observations occur.

Public data releases

We aim to submit all observations of a given semester to the MPC 6 months after the end of the semesters; e.g. for 2013A, an MPC submission at the end of January 2014. This gives observers on quarterly systems a chance to propose for telescope deadlines a cycle later with no competition. It also gives the theory teams 5 months to work before the world sees the MPC release. Recovery observations will be sent as a batch to the MPC in the same manner, e.g. an MPC submission in August 2014 for the Feb-July 2014 recoveries of the 2013 detections.

CFHT imaging become public a year after the end of each semester, e.g. on August 1, 2014, the 2013A CFHT imaging become public to the world.

Collaboration Teams

The principle contact for each team member should be their topic team's leader.

Team leaders can contact the Core or all other team leaders.

Full list of OSSOS collaborators
Core
CFHT image acquisition, moving object detection, orbit linkage, characterisation.
Binaries
mutual orbits, separation, colours. Leader: A. Parker.
Cometary Activity
Search for coma. Leader: P. Rousselot.
Light curves
Time variable TNOs, phase curves. Leader: S. Benecchi.
Catalogs
Objects slower than OSSOS rate cut) + non-moving object variation (eg. variable stars). Leader: L. Jones.
Nearby objects
Search for and tracking of objects moving faster than OSSOS cuts (roughly, inside 8 AU). SUSPENDED.
Occultations
Predictions, observing campaigns. Leader: W. Fraser.
Resonant Populations
relative populations, libration amplitude distributions. Leader: R. Murray-Clay.
Scattering
Centaurs, Scattering Disk, Oort cloud connection. Leader: N. Kaib
Classical Belt, structure and SDF
H-mag distributions, dependence on class. ABSORBED INTO CORE: Petit as leader.
Surfaces
Colours, NIR spectra. Leader: A. Delsanti.
Thermal Modeling
Thermal evolution of objects. Leader: A. Guilbert

How to join OSSOS

Publications and Proposals

Survey

The project is surveying four fields in 2013-14, and a new set of four in 2015-16. For great detail, see the survey draft and the Accepted Proposal (access restricted to collaboration only).

Figures for presentations etc.

2013A

  • April 2013 preliminary field layout plot (here for reference. As in the proposal; varied very slightly from the observed location)
  • April 2013 observed plot - as the O and E fields have oppositions a month apart, the E field is shown at its 9 April moon-dark location, and the O field at its 8 May moon-dark location. The known TNOs plotted are for new moon, May 9.
  • 13AE discoveries plot - all positions for 9 April 2013

2013B

Timeline

  • June 6/2012: OSSOS was number 1 ranked CFHT Large program. 560hr awarded.
  • Feb. 2013 - Aug 2013 : 2013A data acquisition.
  • Aug 2013 - late Jan 2014 : 2013B data acquisition.
  • Oct 6/2013: Second OSSOS team meeting, at 2013 DPS meeting in Denver.

Help

Consult the User's Guide for information on using the wiki software.