Main Page

From ossos
Revision as of 14:08, 12 January 2018 by Mtb55 (talk | contribs) (→‎Survey)
Jump to navigationJump to search

About OSSOS

All survey observations were acquired by the Canada France Hawaii Telescope and are stored and processed using the Canadian Advanced Network For Astronomical Research. For additional public information is available from our public web site

Data Releases

Collaboration

The Teams will receive the object list for each semester's discoveries as a summary table of internal designations with orbital elements and uncertainties. At release, a typical object will have a semimajor axis uncertainty of 0.1-1%. Dynamical classification using the SSBN 2008 classification will be provided. Core will also provide access to the full astrometry and the imaging data for each detection.

Some topic teams will then wish to propose observations to other telescopes for next-semester studies of the sample; this will likely be the only time when the topic teams have a proposal advantage over the world. At the time of proposal, the ephemerides of most objects will be good to +/- < 30"; the half-year-later CFHT recovery of all objects will have dropped these uncertainties to a few arcseconds by the time P.I.-led exploitation observations occur.

Public

We aim to submit all observations of a given semester to the MPC 6 months after the end of the semester, except for the first semester (2013), which was delayed longer. This gives observers on quarterly systems a chance to propose for telescope deadlines a cycle later with no competition. It also gives the theory teams 5 months to work before the world sees the MPC release. Recovery observations will be sent as a batch to the MPC with the same time delay.

CFHT imaging becomes public a year after the end of each semester, e.g. on August 1, 2016, the 2015A CFHT imaging becomes public to the world.

Collaboration Teams

The principle contact for each team member should be their topic team's leader.

Team leaders can contact the Core.

Full list of OSSOS collaborators
Core
CFHT image acquisition, moving object detection, orbit linkage, characterisation. (Teleconference minutes)
- Classical Belt, structure and SDF
H-mag distributions, dependence on class. ABSORBED INTO CORE: Petit as leader.
Catalogs
Objects slower than OSSOS rate cut) + non-moving object variation (eg. variable stars). Leader: L. Jones.
Binaries
mutual orbits, separation, colours. Leader: K. Noll.
Cometary Activity
Search for coma. Leader: P. Rousselot.
Light curves
Time variable TNOs, phase curves. Leader: M. Schwamb.
Occultations
Predictions, observing campaigns. Leader: W. Fraser.
Resonant Populations
relative populations, libration amplitude distributions. Leader: R. Murray-Clay
Scattering
Centaurs, Scattering Disk, Oort cloud connection. Leader: N. Kaib
Surfaces
Colours, NIR spectra. Leader: A. Delsanti.

SUSPENDED OR MERGED OR DEFUNCT OR INCOMPLETE

Nearby objects
Search for and tracking of objects moving faster than OSSOS cuts (roughly, inside 8 AU). SUSPENDED.
Thermal Modeling
Thermal evolution of objects. Leader: A. Guilbert ALL FUNCTIONS MERGED INTO SURFACES
Jovian Trojans
Proposed Leader: F. Yoshida. Work tasks and worker list never finalized. Does not yet formally exists.

How to join OSSOS

See the main OSSOS web site: http://www.ossos-survey.org/get-involved.html

Publications and Proposals

Survey

Observations have concluded.

Original proposals: see the survey draft and the Accepted Proposal (access restricted to collaboration only).

Figures for presentations etc.

2013A

  • April 2013 preliminary field layout plot (here for reference. As in the proposal; varied very slightly from the observed location)
  • April 2013 observed plot - as the O and E fields have oppositions a month apart, the E field is shown at its 9 April moon-dark location, and the O field at its 8 May moon-dark location. The known TNOs plotted are for new moon, May 9.
  • 13AE discoveries plot - all positions for 9 April 2013

2013B

Calibration

Timeline

  • June 6/2012: OSSOS was number 1 ranked CFHT Large program. 560hr awarded.
  • Oct 6/2013: Second OSSOS team meeting, at 2013 DPS meeting in Denver.
  • June 25-27 2014: OSSOS team workshop in Beaune, France. Meeting Website
  • Nov 2014: Third OSSOS team meeting, 2014 DPS in Tucson.
  • Nov 2015: Fourth OSSOS team meeting, 2015 DPS in Washington DC.
  • Oct 2016: Fifth OSSOS team meeting just before 2016 DPS/EPSC in Pasedena
  • Jan 31/2017: End of 4-year CFHT OSSOS LP allocation

Help

Consult the User's Guide for information on using the wiki software.